CHC9798E

CHC9798E Not APF Authorized. IBM InfoSphere Change Data Capture for z/OS cannot 
execute.

ExplanationCDC Replication is not executing in an APF Authorized address space during initialization. APF Authority is required by this product in order to obtain access to the DB2® resources and services that it must use.

Message Variables—None

Message Destination—System log

System ActionCDC Replication is stopped.

Operator Response—Note the message number and contact the system programmer who is responsible for installing and/or maintaining CDC Replication in your working environment.

Client Administrator Response—None