CECC0049I (0x01020031) CECC0049I The last change successfully applied for the subscription subscription-name was committed at commit-DB2-timestamp. Processing resumes capturing changes at restart-DB2-timestamp when replication is restarted for the subscription.

Explanation

This message is issued by the source server when replication stops for a subscription. In addition, this message is only issued when a controlled end of replication was performed for the subscription.

The message identifies the name of the subscription that completed replication and the source database commit date and time of the last change that was successfully applied by the target server. The message also identifies the date and time when processing resumes in the source database log if replication is restarted for the subscription.

Note: Scheduled end times for IMS subscriptions are modified to account for the difference between timestamp values in IMS log records and the leap-second-adjusted system time as displayed on the z/OS console. This modification makes the time appear to be in the future but ensures that the actual end time of replication is aligned with the leap-second-adjusted system time that is shown on the console.

User response

No action is required.