![[V9.1.0 Jul 2018]](ng910.gif)
![[IBM MQ Advanced]](ngadv.gif)
Migrating replicated data queue managers
When you need to migrate replicated data queue managers (RDQMs), you must upgrade all nodes in a sequence. Do not try to operate with the nodes at different levels. This guidance is appropriate for moving between major releases, or CD releases, but not for applying (fix pack) maintenance.
About this task
The upgrade sequence for HA RDQM configurations consists of suspending a node, uninstalling IBM® MQ and RDQM support, installing the newer version of IBM MQ and RDQM support, then resuming the node. You then move on and repeat this sequence on the next node. Following this sequence ensures that your queue managers continue to run on one of the nodes in the HA group while the migration is in progress.
The upgrade sequence for DR RDQM configurations
consists of upgrading the recovery node, running the DR queue managers on the newly upgraded
recovery node, upgrading the primary node, switching the DR queue managers back to running on the
primary node.
The upgrade sequence for DR/HA RDQM configurations consists of
upgrading the HA group on the recovery site, performing a managed failover from the main site to the
recovery site, and then upgrading the HA group on the main site before failing the queue managers
back to the main site.
Scripts are provided that you run to uninstall and install IBM MQ and RDQM.
The upgrade location must be the same as the original installation location, and all the nodes must use the same location.
You can back up a replicated data queue manager before migration.