Planning considerations for your Operations Console installation or upgrade
To plan for your Operations Console installation or upgrade, you need to know this information.
Prerequisite information for Operations Console users upgrading to or installing i 7.5
When you receive the IBM i release upgrade, all of the user IDs included with the operating system are expired. For all upgrades and installations, you need to establish a connection between the IBM i platform and Operations Console using the service tools user ID. The QSECOFR ID is recommended.
Migration to Operations Console before your system upgrade
When migrating a former load source device that was used with Operations Console local console on a network configuration, and this load source device is to become a load source device in a new partition, the LAN adapter must be deallocated before removing the device from the old partition and installing it in the new partition.
If the result of your system upgrade includes a Hardware Management Console (HMC), make sure to use this as the system console until your upgrade is complete. Because some upgrades are staged, your intended console might lack the necessary resources for a period of time. Because the HMC uses virtual resources, you will not have problems with a lack of resources for another console type.