Refreshing and redoing
Refreshing the control flow graph displays the graph as if you were opening the Control Flow Graph window. The display shows the control flow graph at the top level. All marking is removed, and all nodes are collapsed to the maximum, so that only program entry nodes and unresolved nodes are displayed. The current node (or its collapsed equivalent) remains current.
Redoing the control flow graph displays the graph with the current
structure. All the nodes that were displayed in the control flow graph
before the graph was redone
are displayed in the graph afterwards.
The graph is displayed zoomed to the minimum magnification, which
means that the entire graph is displayed in the control flow graph
area. All marking is retained, as is the currently selected node.
In either case, the display or non-display of return arcs is maintained.
- On the Control Flow Graph window View menu, click Refresh.
Alternatively, click the Refresh icon, or right-click the white area of the graph, and from the pop-up menu, click Refresh.
- On the Control Flow Graph window Window menu, click Layout, then click Redo Layout.
Alternatively, click the Redo icon.
See also Working with the control flow graph