Air conditioning determination

The air conditioning system must provide year-round temperature and humidity control as a result of the heat dissipated during equipment operation.

Heat dissipation ratings are given in the server specifications for each server. Air conditioning units must not be powered from the computer power panel because of the high starting current drawn by their compressor units. The feeder line for the air conditioning system and the computer room power must not be in the same conduit.

Consider the following factors when you determine the air conditioning capacity necessary for installation:

  • Information technology equipment heat dissipation
  • Number of personnel
  • Lighting requirements
  • Amount of fresh air introduced
  • Possible reheating of circulated air
  • Heat conduction through outer walls and windows
  • Ceiling height
  • Area of floors
  • Number and placement of door openings
  • Number and height of partitions

Most servers are air-cooled by internal blowers. A separate air conditioning system is suggested for data processing installation. A separate system might be required for small systems or individual servers that are intended for operation when the building air conditioning system is not adequate or is not operational. Server heat dissipation loads are given on the server specifications for each server. See the environmental requirements in the server specifications for your server.