Installing IBM Storage Fusion HCI System in a disaster recovery setup

Use the sequence mentioned in this procedure to install IBM Storage Fusion HCI System with Metro-DR setup.

Before you begin

Important: Contact IBM support before you begin the installation of Metro-DR deployment.

Procedure

  1. Install site 1.
    For the procedure to install, see the single rack installation procedure in Installing IBM Storage Fusion HCI System.
  2. Upgrade site 2.
    For the procedure to install, see the single rack installation procedure in Installing IBM Storage Fusion HCI System.
  3. For Metro-DR, set up the Tiebreaker. For the tiebreaker procedure, see Preparing the tiebreaker.

What to do next

Metro-DR
Set up Metro-DR, Enable applications for Metro-DR, Failover applications from site 1 to site 2, and Failback applications from the mirrored site to the original site. For the procedure, see Metro-DR for IBM Storage Fusion HCI System.