IBM service replacement responsibilities
IBM System Services Representatives (SSR) are responsible for the physical replacement and labeling of the chassis. The SSR performs the following tasks during the replacement:
Disconnecting the cables
Remove the old switch chassis and install the new switch chassis
Disconnecting the cables
Remove the old switch chassis and install the new switch chassis
Parent topic:
Chassis replacement