IBM service replacement responsibilities

IBM System Services Representatives (SSR) are responsible for the physical replacement and labeling of the chassis. The SSR performs the following tasks during the replacement:
  1. Disconnecting the cables
  2. Remove the old switch chassis and install the new switch chassis