Time and items required

The installation or replacement procedure for one transceiver takes less than five minutes. Ensure that the following items are available:

  • Required number of compatible power cables
  • Required number of supported transceivers

    Refer to the Fabric OS Release Notes for the list of supported transceivers and cables.

  • Required number of compatible fiber-optic cables
  • Optical transceiver extraction tool (for 10-Gbps transceiver only)
    Note: Most IBM switches, backbones, and directors come with a transceiver extraction tool and holster. The extraction tool is designed to remove transceivers from modules where the space is limited.
    Figure 1. Optical transceiver extraction tool
    Optical transceiver extraction tool