Enclosure location guidelines
Use these guidelines to plan the location of a control enclosure and any expansion enclosures that attach to it.
Each control enclosure contains two node canisters, forming an I/O group. The guidelines apply on an I/O group by I/O group basis.
Note: A mounting rail kit is provided with each control enclosure and expansion enclosure. Each rail
can expand to accommodate a range of rack depths, which are measured between the front and rear
mounting posts of the rack. However, because there are differences between some types of mounting
rails, be sure to use the specific rail kit that is supplied with each control or expansion
enclosure.
Note: A SAS chain is the set of
enclosures connected via a single SAS ports on each node canister in the control enclosure.
Plan for one of the following types of installation.