Unpacking and Inspecting the Switch

CAUTION:

When handling switch components, wear an ESD strap and handle modules using only the carrier edges. An ESD socket is provided on the chassis. For an ESD socket to be effective, the chassis must be grounded through the power cable, the chassis ground, or the metal-to-metal connection with a grounded rack.

Tip:

Retain the shipping container in case the chassis has to be shipped in the future.

Note:

The switch is thoroughly inspected before shipment. If any damage occurs during transportation, or if any item is missing, contact your customer representative immediately.

To inspect the shipment, follow these steps:

  1. Compare the shipment to the equipment list provided by your customer service representative and verify that you have received all items, including the following:
    • Grounding lug kit
    • Rack-mount kit
    • ESD wrist strap
    • Cables and connectors
    • Optional items, if any, ordered
  2. Check for damage and report any discrepancies or damage, to your customer service representative. Have the following information ready:
    • Invoice number of shipper (see packing slip)
    • Model and serial number of the damaged unit
    • Description of damage
    • Effect of damage on the installation
  3. Check to be sure that all the power supplies and the fan trays have the expected direction of airflow. Port-side intake airflow modules have a red coloring, and port-side exhaust airflow modules have blue coloring. For more information, see the Power Supplies and Fan Modules sections.