Planning for hardware

This information is intended to help prepare the physical site for the installation of a FlashSystem 7300 .

About this task

Certain physical site specifications must be met before the system can be set up. This activity includes verifying that adequate space is available, and that requirements for power and environmental conditions are met.

Procedure

  1. Review all the guidelines in the planning topics to understand where the system can be installed and identify all prerequisites, such as building structure, equipment rack, environmental controls, power supply, and accessibility.
  2. Complete the Planning worksheets to record the information for the initial system creation.

What to do next

For more details on the planning for hardware, see the following pages: