Installing
This information covers the system hardware installation and initial setup.
After you verify that the power and environmental requirements of the system are met, and planning the location of the enclosure, you are ready to begin installing the hardware components. The installation activity follows the plan that is used in the planning section.
If you purchase IBM ECS, IBM System Services Representatives (SSRs) are responsible for some installing, updating, and troubleshooting tasks. Consult your IBM Sales Representative or your IBM reseller to understand the specific services that IBM provides.
The installation poster provides an illustrated sequence of steps for installing the enclosure in a rack and beginning the setup process. Refer to Installation Poster.
For more details on the installation, see the following pages: