Work Packages

Work packages are containers provided in the system to bundle actions together. This allows for a better organization of actions within the project.

Actions that have been linked to projects are displayed in the work package section.

The following options are available in the work packages section:
  • Assign action: assign an action to an existing work package
  • New work package: create a new work package
  • Edit work package: edit an existing work package
  • Delete work package: delete an existing work package

Work package status

The status of the work package gets automatically updated as the status of the included action changes.

The work package can have the following status:
  • Started - if all the actions in the work package have the status as started.
  • In progress
  • Finished - if all the actions in the work package have the status as finished.
If the work package contains actions that have the status as In creation or Aborted, the work package status is displayed as empty.
Note: Maximum 200 actions and 20 work packages can be added per project.