Power Enterprise Pools 2.0 - What is a credit and current consumption rates

A credit represents a generic resource available for your pool's consumption. Tracking is done every minute and reported back to IBM once a day. Software and hardware usage are tracked separately so that you can control your metered usage in more detail.

The table provides an overview for the current credit consumption rates - the amount of metered resource-minutes required to use up a credit from your pool:

High-end Midrange Scale-out Metering
Hardware metering
1 Processor Core Activation - AnyOS 35,000 120,000 150,000 core-minutes/credit
1 Processor Core Activation - Linux/VIOS only 88,000 180,000 150,000 core-minutes/credit
1 GB Memory Activation 3,600,000 15,000,000 N/A GB-minutes/credit
Software metering
AIX 30,000 60,000 60,000 core-minutes/credit
IBM i P10 Tier 6,500 N/A 6,500 core-minutes/credit
IBM i P20 Tier 3,000 N/A 3,000 core-minutes/credit
IBM i P30 Tier 2,200 N/A 2,200 core-minutes/credit
SUSE Linux Enterprise Server for Power 70,000 90,000 N/A core-minutes/credit
Red Hat Enterprise Linux for Power 70,000 90,000 90,000 core-minutes/credit
Red Hat OpenShift Container Platform for Power 22,000 23,000 23,000 core-minutes/credit
PowerHA SystemMirror for AIX - Standard Edition 30,000 38,000 38,000 core-minutes/credit
PowerHA SystemMirror for AIX - Enterprise Edition 23,000 32,000 32,000 core-minutes/credit
PowerHA SystemMirror for IBM i software Small Tier - P10/P20 32,000 N/A 32,000 core-minutes/credit
PowerHA SystemMirror for IBM i software Medium Tier - P30 23,000 N/A 23,000 core-minutes/credit

Power models supported in Power Enterprise Pools 2.0

High-end

  • 9080-M9S - IBM Power E980
  • 9080-HEX - IBM Power E1080
  • 9080-HEU - IBM Power E1180

Midrange

  • 9040-MR9 - IBM Power E950
  • 9043-MRX - IBM Power E1050
  • 9043-MRU - IBM Power E1150

Scale-out

  • 9009-22G - IBM Power S922
  • 9009-42G - IBM Power S924
  • 9105-22A - IBM Power S1022
  • 9105-42A - IBM Power S1024
  • 9824-22A - IBM Power S1122
  • 9824-42A - IBM Power S1124
Note: No more than two consecutive hardware generations can be in the same pool. So, you cannot have both Power9 and Power11 in a single pool.

Parent topic:

Power Enterprise Pools 2.0 - How to buy Power Capacity Credits?