Known issues
Review the issues with workarounds and limitations at the time of 7.0.2 release. For updates on these issues, see interim fix readme documents or IBM® Engineering Lifecycle Management documentation.
Workarounds
The following issues in this release have workarounds.
ID | Description |
---|---|
426064 |
An error is displayed when the IBM Engineering Workflow Management Client Extension is installed with products based on Eclipse 4.6 (Neon). First occurrence: 6.0.3 Problem: When the IBM Engineering Workflow Management, formerly known as Rational Team Concert Client Extension is installed with products that are based on Eclipse 4.6 (Neon), such as Rational Software Architect, an error might be displayed once each session with text such as An SWT error has occurred or No more handles. Workaround: On Linux systems that use the apt-get tool to install software, run the following command to install the libwebkitgtk library:sudo apt-get install libwebkitgtk-1.0-0On Linux systems that use RPM to install software, such as Red Hat, download webkitgtk-2.4.9-1.el7.x86_64.rpm and run sudo rpm -ihv webkitgtk-2.4.9-1.el7.x86_64.rpm to install it |
450488 |
Conditions might be removed if queries created in the web client are edited in earlier versions of the client for Eclipse IDE. First occurrence: 6.0.6 Problem: If you use version 6.0.6 or later of IBM Engineering Workflow Management) web client to create a work item query that contains a Tags equals Unassigned condition, and then edit the query in version 6.0.5 or earlier of the client for Eclipse IDE, the Tags equals Unassigned condition might be removed. Workaround: Do not use a version 6.0.5 or earlier client for Eclipse IDE to edit a work item query that was created or edited in the 6.0.6 or later web client. |
524676 |
Context aware search facility does not work in release 7.0.2. First occurrence: 7.0.2 Problem: You cannot use the context aware search ability from the work item context menu when a 7.0.2 search engine is deployed. The search results are empty. Workaround: Use context aware search engine from 7.0.1. This issue was resolved in 7.0.2 iFix001 and the context aware search ability from the work item context menu works as before. |
420663 |
IBM Engineering Workflow Management client is not installed on all instances of Microsoft Visual Studio 2017 First occurrence: 6.0.4 Problem: When you install the IBM Engineering Workflow Management client for Microsoft Visual Studio IDE from IBM Installation Manager and select Visual Studio 2017, the integration is installed on all instances of Microsoft Visual Studio 2017. However, if you install additional instances of Microsoft Visual Studio 2017 after you install the IBM Engineering Workflow Management client, the integration is not available on the newly installed instances of Microsoft Visual Studio 2017. Workaround: Reinstall the IBM Engineering Workflow Management (formerly known as Rational Team Concert)
client for Microsoft Visual Studio IDE by completing the following steps:
In IBM Installation Manager, this process installs the IBM Engineering Workflow Management client on all installed instances of Microsoft Visual Studio 2017. |
479690 |
IBM Engineering Workflow Management client is not installed on all instances of Microsoft Visual Studio 2019. First occurrence: 6.0.6.1 Problem: When you install the IBM Engineering Workflow Management client for Microsoft Visual Studio IDE from IBM Installation Manager and select Visual Studio 2019, the integration is installed on all instances of Microsoft Visual Studio 2019. However, if you install additional instances of Microsoft Visual Studio 2019 after you install the IBM Engineering Workflow Management client, the integration is not available on the newly installed instances of Microsoft Visual Studio 2019. Workaround: Reinstall the IBM Engineering Workflow Managementclient for Microsoft Visual Studio IDE by
completing the following steps:
|
485185 |
IBM Engineering Workflow Management Tracking and Planning artifacts from existing archived project areas are not automatically deleted from the LQE store on upgrade to 7.0.2 First occurrence: 7.0.1 Problem: IBM Engineering Workflow Management Tracking and Planning artifacts from existing archived project areas are not automatically deleted from the LQE store after upgrade to 7.0.2. In 7.0.2, when you archive a project area, delete events are published to the IBM Engineering Workflow Management Tracking and Planning TRS feed for all Tracking and Planning artifacts that belong to the project area, so that LQE or any other consumer can consume the events. When you restore a previously archived project area, creation events are published to the TRS Feed. Workaround: Run LQE validation to delete IBM Engineering Workflow Management tracking and planning artifacts
from existing archived project areas from the LQE store after upgrade to 7.0.2.
Note: If the data
source was reindexed after the upgrade then LQE validation is not required.
|
491523 |
IBM Engineering Workflow Management work item editors might not display the same tabs in the the web client on upgrade to 7.0. First occurrence: 7.0 Problem: In versions earlier than IBM Engineering Workflow Management 7.0, work item editors with multiple tabs using the Overview layout with the same label only display the last tab with the shared label. In IBM Engineering Workflow Management 7.0, work Item editors display all tabs with unique IDs. This might result in more tabs to be visible than in previous versions.In versions earlier than IBM Engineering Workflow Management 7.0, work Item editors display all uniquely labeled Overview layout tabs, including those with duplicate tab IDs. Duplicate tabs can be added to the same editor via "Reuse Existing Tab".In 7.0, IBM Engineering Workflow Management, Work Item editors display all tabs with unique IDs. This might result in fewer tabs to be visible than in previous versions. Workaround: If you see unexpected tabs, modify the process configuration to remove tabs that should not be present. If you do not see expected tabs, modify the process configuration to ensure that all expected tabs have unique tab IDs. |
457676 | Excluded expressions are always listed as First occurrence: 6.0.3 Problem: In a project area that uses the SAFe Program process template, when you edit a plan view and select Exclude and Expression, the editor sets the expression to All except business safe work types regardless of the expression that you select. Workaround
Original filter definition:<filter description="Exclude all work item types except
business safe work types." id="com.ibm.team.apt.filter.excludeBusinessSAFeWorkType"
implementation="com.ibm.team.apt.shared.ui.internal.filter.QuickQueryFilter" name="All except
business safe work types."><parameters> <parameter key="expression"
value="safeWorkType:Business"/> </parameters></filter>New filter definition:<filter
description="Exclude all work item types except business safe work types."
id="com.ibm.team.apt.filter.excludeBusinessSAFeWorkType"
implementation="com.ibm.team.apt.shared.ui.internal.filter.CustomQuickQueryFilter" name="All except
business safe work types."><parameters> <parameter key="expression"
value="safeWorkType:Business"/> <parameter key="isPreDefinedFilter" value="true"/>
</parameters></filter> |
479360 | Full-text search indexes must be rebuilt when you upgrade to 7.0 or later. First occurrence: 6.0.6.1 Problem: This upgrade requires all existing full-text search indexes that were created in 6.0.6.1 or earlier to be rebuilt. Full-text search indexes must be rebuilt for both the CLM servers and the Rational Team Concert (now known as IBM Engineering Workflow Management) Client for Eclipse IDE. Workaround: Typically, when you upgrade an installation by using the upgrade
scripts, the full-text search indexes from the earlier installation are copied to the new
installation. However, the upgrade scripts do not copy previous indexes from version 6.0.6.1 or
earlier (including interim fixes). Instead, the new server automatically rebuilds the indexes in the
background after you start it. Results of full-text searches might be incomplete until the
reindexing operation is finished; the progress of the reindex is periodically written to the server
log file. Alternatively, instead of allowing the server to rebuild full-text search indexes online,
you can rebuild them manually by running the repotools-<app> -rebuildTextIndices command after
the upgrade is complete, but before you start the server, where <app> is one of am, ccm, or qm.
Note that reindexing might be a lengthy process and can take many hours for a large database. In the
web client, a system alert in the banner states that reindexing is in progress. If you follow a
manual upgrade procedure instead of running the upgrade scripts, you must ensure that the full-text
indexes are not copied from the old installation to the new installation. If the new installation is
configured to use the same full-text index location as the old installation (the value of the
com.ibm.team.fulltext.indexLocation property in the old and new teamserver.properties file is the
same absolute path name), you must either run the
|
420473 |
IBM Installation Manager does not detect Microsoft Visual Studio 2017 when it is installed First occurrence: 6.0.4 Problem: When you install the IBM Engineering Workflow Management client for Microsoft Visual Studio IDE, an additional option for Visual Studio 2017 is available. The option is disabled if Visual Studio 2017 is not detected on the computer, or if the Visual Studio 2017 installation is corrupt. Microsoft provides a Setup API to query installed editions of Visual Studio 2017 with sample code and utilities at Microsoft/vs-setup-samples. Run the sample to determine whether your Visual Studio 2017 installation is corrupt. Workaround: If the installation is corrupt, repair Visual Studio 2017 and ensure that it installs successfully.
|
479688 |
IBM Installation Manager does not detect Microsoft Visual Studio 2019 when it is installed. First occurrence: 6.0.6.1 Problem:When you install the IBM Engineering Workflow Management client for Microsoft Visual Studio IDE, an additional option for Visual Studio 2019 is available. The option is disabled if Visual Studio 2019 is not detected on the computer, or if the Visual Studio 2019 installation is corrupt. Microsoft provides a Setup API to query installed editions of Visual Studio 2019 with sample code and utilities at Microsoft/vs-setup-samples. Run the sample to determine whether your Visual Studio 2019 installation is corrupt. Workaround: If the installation is corrupt, repair Visual Studio 2019 and ensure that it installs successfully.
|
422752 |
Jazz repository login errors occur if the IBM Engineering Workflow Management Client Extension is installed after Rational Software Architect First occurrence: 6.0.3 Problem: This issue occurs if you use IBM Installation Manager to install Rational Software
Architect 9.5 or 9.6 (and possibly other versions) and then install version 6.0.3 interim fix 005 or
later of the IBM Engineering Workflow Management client extension for Eclipse 4.x. After you install the client
extension, you cannot log in to IBM Engineering Workflow Management server and receive a Repository Connection
Failed error or errors in the Eclipse error log that begin like
this: Workaround: This issue does not occur if you install Rational Software Architect and the IBM Engineering Workflow Management Client Extension at the same time. For new installations, use IBM Installation
Manager to install both items at the same time.If you already have Rational Software Architect
installed, and then install the client extension and experience this issue, start the Eclipse IDE by
using the |
447933 | Licensing errors might occur if you upgrade the Java environment or upgrade applications to version 6.0.5 or later. First occurrence: 6.0.5 Problem: If you upgrade your version
of Java to a fix pack that was built after April 2017, or you upgrade an application to version
6.0.5 or later and are using WebSphere Liberty, licensing errors might occur. The errors occur
because earlier licenses were signed with the MD5 algorithm, which is now blocked by newer versions
of Java.For example, the License Key Management page for Jazz Team Server might display the
following error in the Description field: Workaround: The licenses in the IBM License Key Center were updated to use a different signature algorithm.After you upgrade your server to version 6.0.5 or later, obtain the updated licenses from the IBM License Key Center to replace your current licenses. If you previously used floating, token, or authorized user single install licenses, install their updated versions. Your existing user license assignments are kept during the installation of the updated licenses. Important: If you are not upgrading all applications at the same time, you must apply an
interim fix to the applications at earlier versions before you upgrade Jazz Team Server. The
following interim fixes contain the compatible version of Java:
If you cannot apply the interim fix before the upgrade, upgrade Jazz Team Server and
then complete the steps in the IBM
Support flash article. If you do not apply the interim fix or complete the steps in the
article, the internal licenses do not load on Jazz Team Server and the applications might experience
issues.To update your current license files, follow the instructions in the Interactive Upgrade Guide or complete the following steps
based on the type of license: term (floating or authorized user) or token licenses:
Note: For token
licenses, you are only required to download the jazztokens.zip file. You do not have to download the
license.dat file because it does not contain changes.
Note: If you imported trial licenses before the newer versions of Java were adopted, you might still
receive errors in the jts.log file even after you import the updated licenses. For example, you
might receive this error:
CRJAZ0965I The file was not a valid server or client access
license activation key. You can ignore these errors. |
497806 |
MacOS download quarantine prevents applications from starting. First occurrence: 6.0.x Problem: In recent versions of MacOS, downloaded compressed files might be marked with a
quarantine attribute that prevents applications in the download from running. Downloads affected by
this include the ELM Web Installer for macOS; IBM Engineering Workflow Management Eclipse IDE Client, IBM Engineering Workflow Management Build system, and IBM Engineering Workflow Management SCM tools compressed downloads for
macOS.The problem manifests as a failure to launch the application in the download. For example, if
the ELM Web Installer is downloaded and decompressed, running the Workaround: Use the |
500650 |
Outdent cannot be used on lines that contain nested content. First occurrence: 6.0.3 Problem: Content that is copied from external sources into the Work Item editor might contain
HTML data structures that prevent the outdent functionality from being used. For example, the
following data prevents outdent from being used (on "Line 1"): Workaround: There are several mechanisms that can be used to work around this issue. All of them center around modifying the content to remove the elements between the indented element and the content. Complete the following steps:
|
441551 | The First occurrence: 6.0.4 Problem: Enumeration literal values for the Complexity attribute were modified in the SAFe 4.0 Process (Program) template; however, the calculated script that uses this attribute was not updated. As a result, the calculated value for "Story Points (numeric)" is always 0. Workaround: Complete these steps:
|
511261 |
The clmhelp.war file and the updateSite.zip for release 7.0.1 are unavailable for download. First occurrence: 7.0.1 Problem: The clmhelp.war file and the updateSite.zip file for release 7.0.2 are unavailable for download due to technical issues. Workaround: You can install the KCCI.zip file on your intranet server to view the help locally. Click here to download the ELM702_KCCI_contents.zip file.For information about installing the KCCI.zip file, see the Installing help on an intranet server topic. |
420615 |
URL for work item OSLC pickers has changed. First occurrence: 6.0.4 Problem: In version 6.0.4 and later, the URL for the work item OSLC picker uses pickers instead
of _ajax-modules.The following example shows the new URL format:
Workaround: If you use a whitelist, change the URLs by replacing |
498438 |
Windows 10 security feature causes slow startup and runtime for Eclipse applications. First occurrence: 6.0.x Problem: Eclipse based applications running on Windows 10 might start and run slowly, due to default security configuration. This applies to the ELM Web Installer launchpad, IBM Engineering Workflow Management client downloads and installs, the Jazz server, and any other Jazz applications that are based on Eclipse. Workaround: This issue can be worked around by creating a security exclusion for the folder containing the Eclipse application. For information about creating the security exclusion, go to the Microsoft support website, complete the following steps.
|
520362 |
Windows 10 updates break IBM Engineering Workflow Management Shell Control Panel functionality. First occurrence: 6.0.4 Problem: When you start the IBM Engineering Workflow Management Shell Control Panel by clicking the Start menu or the taskbar icon, you see a duplicate taskbar icon. Also, operations that you perform in the Control Panel such as switching modes, connecting to a repository, setting up a sandbox, or changing preferences, are not applied to other File Explorer windows. Each taskbar icon can display a different set of menu items based on the operations that you perform in the Control Panel. The Windows 10 updates that were released in October 2020 cause the Control Panel to open in a different explorer.exe process. IBM Engineering Workflow Management Shell does not support a configuration where multiple Windows Explorer processes are running at the same time. In version 6.0.3 or earlier, IBM Engineering Workflow Management Shell resides on the desktop and not in the control panel, and hence, is not affected by Windows 10 updates. Workaround: Complete the following steps:
|
Limitations
The following issues in this release do not have workarounds.
ID | Description |
---|---|
558245 |
An error is shown when performing Git commit operation if you are using post receive hooks First occurrence: 7.0.2 Problem: In GitLab 15.3.1, when post-receive hooks are configured for linking work items to Git commits and you perform the push operation through the Git CLI client, an error “128: Author identity unknown” is shown. However, the Git push is successful and the work item is updated with a link to the Git commit. |
448381 |
Connecting to IBM Bluemix DevOps Services projects is no longer supported First occurrence: 6.0.5 Problem: In previous releases, you could connect from the IBM Engineering Workflow Management client for Eclipse IDE and the IBM Engineering Workflow Management client for Microsoft Visual Studio IDE to IBM Bluemix DevOps Services projects. You can no longer connect to IBM Bluemix DevOps Services projects from those clients. DevOps Services at hub.jazz.net is retired. |
509897 |
Context-sensitive help for VSTest does not load in the Eclipse client for IBM Engineering Workflow Management First occurrence: 7.0.1 Problem: When you open Dynamic Help for the VSTest configuration in the Build Definition Editor, the correspondinghelp topic is not displayed. Instead, the Build Definition Editor help topic is displayed. |
422892 |
IBM Engineering Workflow Management Shell does not show the status of ignored files and folders First occurrence: 5.0 Problem: IBM Engineering Workflow Management (formerly known as Rational Team Concert) Shell uses overlay icons to indicate the source control status of files and folders in a sandbox. However, in Windows 8.1 and 10, IBM Engineering Workflow Management does not use overlay icons to show the source control status of ignored files and folders. To view the source control status of a file or folder, right-click it; then, click Status under IBM EWM. For versions earlier than IBM Engineering Workflow Management 7.0, right-click and then, click Pending Changes Status under Rational Team Concert. If the file or folder is not ignored, and the overlay icon is not displayed, see Workaround: Overlay icons do not appear on files and folders in a sandbox in Rational Team Concert Shell to check for overlay icon issues in Rational Team Concert (now known as IBM Engineering Workflow Management) Shell. Workaround: Overlay icons do not appear on files and folders in a sandbox in Rational Team Concert Shell |
420861 | Extensions should not be disabled or uninstalled from Microsoft Visual Studio 2017 First occurrence: 6.0.4 Problem: When you install IBM IBM Engineering Workflow Management into Microsoft Visual Studio 2017, the IBM Engineering Workflow Management extensions are listed under . Do not disable or uninstall the IBM Engineering Workflow Management extensions from within Visual Studio 2017. To install or uninstall the IBM Engineering Workflow Management client for Microsoft Visual Studio IDE, use only IBM Installation Manager. |
479689 | Extensions should not be disabled or uninstalled from Microsoft Visual Studio 2019. First occurrence: 6.0.6.1 Problem: When you install IBM Engineering Workflow Management into Microsoft Visual Studio 2019, the IBM Engineering Workflow Managementextensions are listed under . Do not disable or uninstall the IBM Engineering Workflow Management extensions from within Visual Studio 2019. To install or uninstall the IBM Engineering Workflow Managementclient for Microsoft Visual Studio IDE, use only IBM Installation Manager. |
460672 |
Java 8 SR5 Fix Pack 5 through Fix Pack 10 is not supported as the runtime for IBM Engineering Lifecycle Management applications on a Windows platform First occurrence: 6.0.5 Problem: IBM Engineering Lifecycle Management applications on a Windows platform that run on Java 8 SR5 Fix Pack 5 through Fix Pack 10 encounter null pointer exceptions and might not be usable. Use Java 8 SR5 Fix Pack 11 (8.0.5.11) or later as the runtime. |
455687 |
Issues with IBM Engineering Workflow Managementon Eclipse 4.4 and 4.6 First occurrence: 6.0.6 Problem: Starting in version 6.0.6, the downloads for the Rational Team Concert (now known as IBM Engineering Workflow Management) Client for Eclipse IDE are based on Eclipse 4.4. and 4.6. The following known issues are related to these versions of Eclipse. Common issues
Linux-specific issues
Mac-specific issues
|
484837 |
Queries return wrong results for medium HTML type attribute when bold or italics is applied First occurrence: 4.0.4 Problem: A work item query with a condition set for any medium HTML type attribute does not return work items if the attribute value contains HTML tags (such as bold or italics) within the otherwise matching value. A work item query with a condition set for the HTML attribute, in this case, summary, returns only the work item with summary "test example". The query does not return the work items with summary "test example partial" or "test example" because in both the cases, the HTML tags are within the matching value. You can use the full-text condition to find such work items. However, full-text condition looks for occurrence in not only the specific attribute but all attributes that support full-text search. Hence, it can include more matching results than expected.Image of query with full text condition. |