Associating test plans with requirement collections, modules, and module views in the Requirements Management application
When the applications of Engineering Lifecycle Management are integrated, you can link test plans to requirement collections, modules, and module views in the Requirements Management application. Later, you can assign each requirement in the collection to a test case and link to the test case from the test plan to ensure that the requirements have complete testing coverage.
About this task
When you can navigate from the target of a link back to the source of the link, this is known as bidirectional linking.
If the configuration management is enabled in the Quality Management project, the links are stored in the source artifact repository and back-links are discovered by the target artifact server making queries on the source artifact servers or LDX.
If configuration management is not enabled, the source and target applications store their links in separate databases, and the source application does not have access to the database in the target application. Certain transactional operations, such as when artifacts are copied or deleted, can occur on the source application server. In these cases, corresponding back links in artifacts in the target application are not automatically added or removed. Also, instances occur where back links are intentionally removed from the target application without removing the corresponding link from the source application. As a result, if bidirectional links are not in a state of synchronization, traceability between the source and target artifacts can appear different based on your starting viewpoint.
To add or remove target artifact links to or from the source artifact, you do not need permission to save the target artifacts.
Procedure
What to do next
You can reconcile the test plan with the requirements in the associated requirement collections to add test coverage for the requirements. During a reconcile operation, requirements without test coverage in the test plan are identified and you can choose to associate the requirements with existing test cases or to generate test cases for the requirements.