Lifecycle project templates

The Lifecycle Project Administration user interface includes predefined templates that you can use to create a lifecycle project and the project areas that belong to that lifecycle project. The predefined templates define which application project areas to create and which associations are established between those project areas.

Note: SAFe® 6.0 templates for Engineering Lifecycle Management are available on Jazz®.net. You can download the templates from SAFe® 6.0 templates for IBM Engineering Lifecycle Management. The available predefined process templates are Full SAFe® 6.0 and Essential SAFe® 6.0. You can use them to configure tooling environment for SAFe® Portfolio, Large Solution, Portfolio, or Essential SAFe® 6.0 configuration in Engineering Lifecycle Management. For more information, see Say Hello to SAFe® 6.0!.

The Lifecycle Project Administration user interface includes the following predefined lifecycle project templates.

Quality Professional, Analyst, Developer

This template sets up associated project areas for Engineering Test Management, Engineering Requirements Management DOORS® Next, and Engineering Workflow Management. The testers (in Engineering Test Management) and analysts (in Engineering Requirements Management DOORS Next) work with developers (in Engineering Workflow Management). Engineering Test Management tasks and requirements change requests are tracked in the Engineering Workflow Management project area. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template. The Engineering Test Management project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, or default process template. The requirements management project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.
This image shows three project areas within the lifecycle project. The Engineering Workflow Management project area stores Engineering Test Management tasks and defects for Engineering Test Management project area testers. The Engineering Workflow Management project area stores implementation requests and requirements change requests for Engineering Requirements Management DOORS Next project area analysts. The RM project area stores requirements for Engineering Test Management project area testers.

Quality Professional, Analyst, Developer, Architect

This template sets up associated project areas for Engineering Test Management, Engineering Requirements Management DOORS Next, and Engineering Workflow Management. The Engineering Workflow Management project area is configured to support architecture management. The testers (in Engineering Test Management), analysts (in Engineering Requirements Management DOORS Next), and architects (in Engineering Workflow Management ) work integrated with development (in Engineering Workflow Management). Engineering Test Management tasks, requirements change requests, and architecture change requests are tracked in the Engineering Workflow Management project area. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template. The Engineering Test Management project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, or default process template. The Engineering Requirements Management DOORS Next project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.

Product Engineer, Developer

This template sets up associated project areas for Engineering Workflow Management and product line engineering.

Quality Professional, Developer – without Requirements

This template sets up associated project areas for Engineering Workflow Management and Engineering Test Management. The testers (in Engineering Test Management) work with developers (in Engineering Workflow Management ). Engineering Test Management tasks are tracked in the Engineering Workflow Management project area. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template. The Engineering Test Management project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, or default process template. Capabilities for requirements are not set up, assuming that other tools and integrations will be used for this capability.
This image shows two project areas in the lifecycle project. The Engineering Workflow Management project area stores Engineering Test Management tasks and defects for Engineering Test Management project area testers.

Quality Professional, Analyst

This template sets up associated project areas for Engineering Test Management and Engineering Requirements Management DOORS Next. Engineering Test Management tasks and requirements change requests are tracked in a separate Engineering Workflow Management project area. The Engineering Test Management project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, or default process template. The Engineering Requirements Management DOORS Next project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template. Capabilities for Defects are not set up, assuming that other tools and integrations will be used for this capability.
This image shows three project areas in the lifecycle project. The Engineering Workflow Management project area stores Engineering Test Management tasks for Engineering Test Management project area testers, and requirements change requests for Engineering Requirements Management DOORS Next project area analysts. The Engineering Requirements Management DOORS Next project area stores requirements for Engineering Test Management project area testers.

Analyst, Developer

This template sets up associated project areas for Engineering Requirements Management DOORS Next and Engineering Workflow Management. The analysts (in Engineering Requirements Management DOORS Next) work with developers (in Engineering Workflow Management). Requirements change requests are tracked in the Engineering Workflow Management project area. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template. The Engineering Requirements Management DOORS Next project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.
This image shows two project areas in the lifecycle project. The Engineering Workflow Management project area stores requirements change requests and implementation change requests for Engineering Requirements Management DOORS Next project area analysts.

Analyst

This template sets up a project area for Engineering Requirements Management DOORS Next. Requirements change requests are tracked in a separate Engineering Workflow Management project area. The Engineering Requirements Management DOORS Next project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.
This image shows two project areas in the lifecycle project. The Engineering Workflow Management project area stores requirements change requests for Engineering Requirements Management DOORS Next project area analysts.

Analyst – without Requirements Change Requests

This template sets up a project area for Engineering Requirements Management DOORS Next. The Engineering Requirements Management DOORS Next project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.

Quality Professional – without Defects and Requirements

This template sets up a project area for Engineering Test Management. Engineering Test Management tasks are tracked in a separate Engineering Workflow Management project area. The Engineering Test Management project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, or default process template. Capabilities for defects and requirements are not set up, assuming that other tools and integrations will be used for these capabilities.
This image shows two project areas in the lifecycle project. The Engineering Workflow Management project area stores Engineering Test Management tasks for Engineering Test Management project area testers.

Developer

This template sets up a project area for Engineering Workflow Management. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template.
This image shows one Engineering Workflow Management project area.

Quality Professional, Analyst, Developer – with separate Engineering Test Management Tasks and Requirements Change Requests

This template sets up project areas for Engineering Test Management, Engineering Requirements Management DOORS Next, and Engineering Workflow Management. The testers (in Engineering Test Management) and analysts (in Engineering Requirements Management DOORS Next) work independently from the developers (in Engineering Workflow Management). Engineering Test Management tasks and requirements change requests are tracked in separate Engineering Workflow Management project areas. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template. The Engineering Test Management project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, or default process template. The Engineering Requirements Management DOORS Next project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.
This image shows three Engineering Workflow Management project areas, a Engineering Test Management project area, and an Engineering Requirements Management DOORS Next project area. One CCM project area stores Engineering Test Management tasks for Engineering Test Management project area testers. The second Engineering Workflow Management project area stores requirements change requests for Engineering Requirements Management DOORS Next project area analysts. The third Engineering Workflow Management project area stores defects for Engineering Test Management project area testers, and implementation requests for Engineering Requirements Management DOORS Next project area analysts. The Engineering Requirements Management DOORS Next project area stores requirements for Engineering Test Management project area testers.

Architect, Analyst

This template sets up associated project areas for change and configuration management and requirements management. The Engineering Workflow Management project area is configured to support architecture management. The architects (in Engineering Workflow Management) work integrated with analysts (in Engineering Requirements Management DOORS Next). Artifacts in the Engineering Workflow Management project area elaborate requirements in the requirements project area. The Engineering Requirements Management DOORS Next project area can be configured to use the SAFe® 5.0SAFe® 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template.

Architect, Developer

This template sets up a Engineering Workflow Management project area that is configured to support architecture management. The architects work integrated with development in the same project area. Architecture change requests are tracked in the project area. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template.

Architect, Developer, Product Engineer

This template sets up project areas for Engineering Workflow Management and product line engineering. The Engineering Workflow Management project area is configured to support architecture management. The Engineering Workflow Management project area can be configured to use the Scaled Agile Framework (SAFe®) 5.0(SAFe®) 6.0(SAFe®) 6.0 Essential, SAFe® 5.0SAFe® 6.0 Full, Scrum, or Formal Project Management process template. The product line engineering project area uses the Product Management Default Process process template.

Architect, Product Engineer

This template sets up associated project areas for Engineering Workflow Management and product line engineering. The Engineering Workflow Management project area is configured to support architecture management.

Architect

This template sets up a project area for architecture management.

Product Engineer

This template sets up a project area for product line engineering.