Configuring data load

You can change the next load configuration settings or keep the default load configuration at Delta load since previous run setting:

About this task

Procedure

  1. On the left pane of the Data Collection Component application, under the Configuration section, select the Delta Load Configuration link.
  2. Under the Enabled column, select the checkbox of the resource group that you want to change the load configuration.
  3. Under the Load Type column, select one of the following load type options from the list:
    Full load
    This load job rebuilds all the data warehouse tables from scratch.
    Delta load since previous run
    This load job only loads the data that has changed or been added since the last successful load. This is the default setting.
    Delta load since date
    This load job requires you to specify a date to load the data that has changed or been added since the selected date.
  4. To apply the changes, click Save.
    Remember: When you change the next load job to a Full load or Delta load since date option, after the job runs with this load type, the load type setting automatically defaults back to the Delta load since previous run setting.