Updating the ClearCase Bridge after server rename: Setting up a test staging environment with production data
When you set up a test staging environment
with production data, you might need to complete more steps to ensure
that the ClearCase Bridge works
as expected after you perform a server rename operation.
About this task
Procedure
- To continue to integrate the IBM® Engineering Lifecycle Management (ELM) production environment with the Rational® ClearCase® production environment, you do not need to change anything. If the ELM production URL did not change, the ClearCase Bridge is integrated with the ELM production environment.
- Do not integrate the ELM staging environment with the Rational ClearCase production environment.
- To test the ClearCase Bridge with the renamed ELM staging environment, integrate the ELM staging environment with the Rational ClearCase staging environment.