Updating the ClearCase Bridge after server rename: Setting up a test staging environment with production data

When you set up a test staging environment with production data, you might need to complete more steps to ensure that the ClearCase Bridge works as expected after you perform a server rename operation.

About this task

These instructions apply to a test-staging environment in the production-data scenario.

Procedure

  • To continue to integrate the IBM® Engineering Lifecycle Management (ELM) production environment with the Rational® ClearCase® production environment, you do not need to change anything. If the ELM production URL did not change, the ClearCase Bridge is integrated with the ELM production environment.
  • Do not integrate the ELM staging environment with the Rational ClearCase production environment.
  • To test the ClearCase Bridge with the renamed ELM staging environment, integrate the ELM staging environment with the Rational ClearCase staging environment.