The Lifecycle Project Administration user interface includes
predefined templates that you can use to create a lifecycle project
and the project areas that belong to that lifecycle project. The predefined
templates define which application project areas to create and which
associations are established between those project areas.
Note: SAFe 6.0 templates for IBM Engineering Lifecycle Management (ELM) are available
on Jazz.net. You can download the templates from
SAFe 6.0 templates for IBM Engineering Lifecycle Management.
The available predefined process templates are
Full SAFe 6.0 and
Essential SAFe 6.0. You can use them to configure tooling environment for
SAFe Portfolio, Large Solution, Portfolio, or Essential SAFe 6.0 configuration in ELM. For more
information, see
Say Hello to SAFe 6.0!.
The Lifecycle Project Administration user interface includes the following predefined lifecycle
project templates.
Quality Professional, Analyst, Developer
This template sets up associated
project areas for quality management, requirements management, and change and configuration
management. The testers (in quality management) and analysts (in requirements management) work with
developers (in change and configuration management). Quality management tasks and requirements
change requests are tracked in the change and configuration management project area. The change and
configuration management project area can be configured to use the Scaled Agile Framework (SAFe) 5.0
Essential, SAFe 5.0 Full, Scrum, or Formal Project Management process template. The quality
management project area can be configured to use the SAFe 5.0 Essential, SAFe 5.0 Full, or default
process template. The requirements management project area can be configured to use the SAFe 5.0
Essential, SAFe 5.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.
Quality Professional, Analyst, Developer, Architect
This template sets up
associated project areas for quality management, requirements management, and change and
configuration management. The change and configuration management project area is configured to
support architecture management. The testers (in quality management), analysts (in requirements
management), and architects (in change and configuration management) work integrated with
development (in change and configuration management). Quality management tasks, requirements change
requests, and architecture change requests are tracked in the change and configuration management
project area. The change and configuration management project area can be configured to use the
Scaled Agile Framework (SAFe) 5.0 Essential, SAFe 5.0 Full, Scrum, or Formal Project Management
process template. The quality management project area can be configured to use the SAFe 5.0
Essential, SAFe 5.0 Full, or default process template. The requirements management project area can
be configured to use the SAFe 5.0 Essential, SAFe 5.0 Full, Base, Use Case, Agile Requirements, or
Traditional Requirements project template.
Product Engineer, Developer
This template sets up associated project areas
for change and configuration management and product line engineering.
Quality Professional, Developer – without Requirements
This template
sets up associated project areas for change and configuration management and quality management. The
testers (in quality management) work with developers (in change and configuration management).
Quality management tasks are tracked in the change and configuration management project area. The
change and configuration management project area can be configured to use the Scaled Agile Framework
(SAFe) 5.0 Essential, SAFe 5.0 Full, Scrum, or Formal Project Management process template. The
quality management project area can be configured to use the SAFe 5.0 Essential, SAFe 5.0 Full, or
default process template. Capabilities for requirements are not set up, assuming that other tools
and integrations will be used for this capability.
Quality Professional, Analyst
This template sets up associated project areas
for quality management and requirements management. Quality management tasks and requirements change
requests are tracked in a separate change and configuration management project area. The quality
management project area can be configured to use the SAFe 5.0 Essential, SAFe 5.0 Full, or default
process template. The requirements management project area can be configured to use the SAFe 5.0
Essential, SAFe 5.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project
template. Capabilities for Defects are not set up, assuming that other tools and integrations will
be used for this capability.
Analyst, Developer
This template sets up associated project areas for
requirements management and change and configuration management. The analysts (in requirements
management) work with developers (in change and configuration management). Requirements change
requests are tracked in the change and configuration management project area. The change and
configuration management project area can be configured to use the Scaled Agile Framework (SAFe) 5.0
Essential, SAFe 5.0 Full, Scrum, or Formal Project Management process template. The requirements
management project area can be configured to use the SAFe 5.0 Essential, SAFe 5.0 Full, Base, Use
Case, Agile Requirements, or Traditional Requirements project template.
Analyst
This template sets up a project area for requirements management.
Requirements change requests are tracked in a separate change and configuration management project
area. The requirements management project area can be configured to use the SAFe 5.0 Essential, SAFe
5.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.
Analyst – without Requirements Change Requests
This template sets up a
project area for requirements management. The requirements management project area can be configured
to use the SAFe 5.0 Essential, SAFe 5.0 Full, Base, Use Case, Agile Requirements, or Traditional
Requirements project template.
Quality Professional – without Defects and Requirements
This template
sets up a project area for quality management. Quality management tasks are tracked in a separate
change and configuration management project area. The quality management project area can be
configured to use the SAFe 5.0 Essential, SAFe 5.0 Full, or default process template. Capabilities
for defects and requirements are not set up, assuming that other tools and integrations will be used
for these capabilities.
Developer
This template sets up a project area for change and configuration
management. The change and configuration management project area can be configured to use the Scaled
Agile Framework (SAFe) 5.0 Essential, SAFe 5.0 Full, Scrum, or Formal Project Management process template.
Quality Professional, Analyst, Developer – with separate Quality Management
Tasks and Requirements Change Requests
This template sets up project areas for quality
management, requirements management, and change and configuration management. The testers (in
quality management) and analysts (in requirements management) work independently from the developers
(in change and configuration management). Quality management tasks and requirements change requests
are tracked in separate change and configuration management project areas. The change and
configuration management project area can be configured to use the Scaled Agile Framework (SAFe) 5.0
Essential, SAFe 5.0 Full, Scrum, or Formal Project Management process template. The quality
management project area can be configured to use the SAFe 5.0 Essential, SAFe 5.0 Full, or default
process template. The requirements management project area can be configured to use the SAFe 5.0
Essential, SAFe 5.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project template.
Architect, Analyst
This template sets up associated project areas for change
and configuration management and requirements management. The change and configuration management
project area is configured to support architecture management. The architects (in change and
configuration management) work integrated with analysts (in requirements management). Artifacts in
the change and configuration management project area elaborate requirements in the requirements
project area. The requirements management project area can be configured to use the SAFe 5.0
Essential, SAFe 5.0 Full, Base, Use Case, Agile Requirements, or Traditional Requirements project
template. The change and configuration management project area can be configured to use the Scaled
Agile Framework (SAFe) 5.0 Essential, SAFe 5.0 Full, Scrum, or Formal Project Management process
template.
Architect, Developer
This template sets up a change and configuration
management project area that is configured to support architecture management. The architects work
integrated with development in the same project area. Architecture change requests are tracked in
the project area. The change and configuration management project area can be configured to use the
Scaled Agile Framework (SAFe) 5.0 Essential, SAFe 5.0 Full, Scrum, or Formal Project Management
process template.
Architect, Developer, Product Engineer
This template sets up project areas
for change and configuration management and product line engineering. The change and configuration
management project area is configured to support architecture management. The change and
configuration management project area can be configured to use the Scaled Agile Framework (SAFe) 5.0
Essential, SAFe 5.0 Full, Scrum, or Formal Project Management process template. The product line
engineering project area uses the Product Management Default Process proecess template.
Architect, Product Engineer
This template sets up associated project areas
for change and configuration management and product line engineering. The change and configuration
management project area is configured to support architecture management.
Architect
This template sets up a project area for architecture management.
Product Engineer
This template sets up a project area for product line
engineering.