Accepting changes from other configurations in the RM application
In a collaborative development environment, you might import changes from another stream or baseline so that you can use them in the stream you work in. To import changes into a stream, use the Accept Changes operation.
Before you begin
- Ensure that you are familiar with project areas, components (if supported), baselines, streams, and change sets (if supported).
- Ensure that you are logged in to a project.
- The changes sets to accept were delivered to the flow target (the destination stream for the change sets). You cannot accept open or active change sets from other streams.
- You must be working in a stream.
Procedure
Select an option:
- To accept changes from another stream or baseline into the current local configuration
(shown on the Current Configuration menu in the Configuration
Context section):
- On the toolbar, click .
- Select the configuration to accept the changes from, and complete the steps in the wizard.
- To accept changes from a stream into a child stream:
- On the toolbar, click .
- Click a stream name.
- Click the Streams tab.
- In the Actions column, beside the stream to update, click . This operation accepts the changes from stream that is open in the stream editor.
- Complete the steps in the wizard.