Earthquake resistance kit installation preparation

Before an IBM® service representative can install the earthquake resistance kit on any frames in your storage system, you must purchase fastening hardware and prepare the location where the kit is to be installed.

The required tasks that you must perform before the earthquake resistance kit installation depends on whether your storage system sits on a raised or a nonraised floor. For either type of installation, work with a consultant or structural engineer to ensure that your site preparations meet the requirements.

The following list provides an overview of the preparations necessary for each type of floor:
Raised floor
  • Cut the necessary holes and cable cutouts in the raised floor.
  • Purchase and install eyebolt fasteners in the concrete floor.
Nonraised floor
Purchase and install fasteners in the concrete floor.