Adding Resource Monitoring sources to a performance schedule by using labels
You can add the Resource Monitoring sources to a performance schedule in IBM® DevOps Test Performance (Test Performance) by using labels that are created in IBM DevOps Test Hub (Test Hub). After you add the Resource Monitoring sources, you can run the schedule from Test Performance.
You must have completed the following tasks:
-
Accessed Test Hub.
-
Configured the Resource Monitoring sources in Test Hub for your project. For more information about Resource Monitoring sources, refer to Monitoring host resources.
-
Specified the Test Hub URL in the product preferences window ( ).
-
Generated an offline user token in Test Hub.
For more information about generating an offline token, refer to Generating an offline token.
-
Selected the project in the product Preferences window from the Project to get sources from the drop-down list.
Note: The Project to get sources from the drop-down list displays all the projects on Test Hub. The name of the team space for the project is displayed within parenthesis. You can select the appropriate project when there are identical project names in different team spaces.
After the schedule run completes, you can view the labels and the Resource Monitoring sources associated with those labels on the Resource page of the Performance Report. The Resources page also displays the Resource Monitoring sources that were unreachable or unavailable during the run time of the schedule.
You must note down the labels that you added to the Resource Monitoring sources in Test Hub. Because you must use these labels to add the Resource Monitoring sources to the performance schedule.
When you run the schedule from Test Hub, the same labels are displayed on the Results page for the schedule. You can open the schedule and go to the Details card to view the Resource Monitoring labels for the schedule that you run.
- The Resources page displays the following
information:
- Labels and Resource Monitoring sources associated with those labels that were monitored during the run time of the schedule.
- All resource counters for those Resource Monitoring sources that were monitored during the run time of the schedule.
- Unavailable Resource Monitoring sources that were unreachable or unavailable during the run time of the schedule.
- The Performance Summary table under
the Resources graph lists the following
information:
- The type of Resource Monitoring sources.
- The most recent values of their corresponding resource counters were monitored during the run time of the schedule.