Copying test steps from one test to another
When a set of steps in a test is required in another test, you can copy them and paste them into an existing test or an empty test. You can select the required steps from a test to copy, although they are not in a sequence. If there are any variables associated with the selected step, they are also copied with the step.
You must have completed the following tasks:
- Ensured that you are assigned a Team Space Owner, Project Owner, or Member with a Tester role to create or edit a test resource.
- Read and understood the information in Edit branch overview and Create or select an Edit branch.
- Ensured that your project contains a Web UI test.
- Opened the test in Test Editor. See Editing a Web UI test.
button displayed on the
to save the
modifications.