You can manage the existing configured integrations.
After an integration is successfully configured, it periodically communicates with the external
tool to synchronize the data flow.
The default communication interval when scheduled event integrations run can be configured by the
PLUGIN_INTEGRATION_RUN_INTERVAL environment variable on the
reporting-consumer service to a valid integer for the minutes between each run.
To manage an integration, perform the following steps:
-
On the Measure
Home page, click .
The Integrations page lists all configured integrations.
All integrations are listed regardless of how they are created. You can use
search functionality for searching the integration in the
Integrations tab. The search query finds the
matches in Name and Type
fields. On the Integrations tab, you can sort the
Name, Status,
Type, and Last sync fields
in ascending or descending order by clicking on the required table header
field.
- Optional:
To modify an integration definition, click overflow menu , and then modify the integration definition properties.
- Optional:
To view the integration log file, click overflow menu .
This action displays the integration's last execution log.
- Optional:
To upgrade or downgrade the plugin used by the integration, click overflow menu .
- Optional:
To sync with the external tool, click overflow menu .
This action attempts to communicate with the external tool immediately. You
might do this when you want to run tests before the next communication interval.
You can also select the time line from when you want to resync the data from the
external tool.
Note:
Not all integration types support this action. All scheduled event
plugins such as Jira, GitHub, GitLab, Azure DevOps, and IBM® DevOps Deploy
are supported with the resync functionality.
- Optional:
To archive an integration, click overflow menu .
Note: Select the Delete the integration
data checkbox to delete the integration data.
- Optional:
To disable or enable an integration, click the
Disable/Enable field of the integration.
Communication with the external tool stops until re-enabled. You might
do this if you want to stop data delivery during testing.
- Optional:
To disable or enable multiple integrations, select the required integrations
and then Select Actions appears. Click the drop-down list
of Select Actions and select
Disable or Enable.