Adding a workload group

A workload group is used to associate one or more related workload definitions or routing rules. When you create a routing rule, CICS Explorer® creates a new workload group to contain the rule. If you have an existing routing rule, or a number of routing rules in a group, you can add them to the workload specification.

Procedure

  1. In the Rules section of the Workload Specification editor, click the Import an existing routing rule or group icon The Import an existing routing rule or group icon. The Import window opens, and shows all the workload groups and routing rule in the CICSplex. Initially, only the descriptions are shown. You can see the group and rule names by clicking the Show or hide names icon The Show or hide names icon. If a routing rule or a workload group is associated with another workload specification, then the resource is not available.
  2. Click the routing rule or workload group that you want to add. If you add a group, then the group and all the available rules in the group are added to the workload specification. If you add a rule, then the rule is added to the workload specification, and a new group is created to contain the rule. The greater than symbol: > indicates that this resource is a new rule or group, and that it is not yet saved.

What to do next

Click the Show or hide names icon A screen capture of the Show or hide names icon to show the workload groups, and their rules, in the workload specification.

You can change the description of the group or the rule by right-clicking and clicking Edit description on the menu.

You can click Ctrl+Z to undo the changes, or click Ctrl+S to save the changes.