BND2464E Run halted before first checkpoint; no restart is possible. Rerun job from the beginning.

Explanation

The checkpoint phase is 1. The first checkpoint was not taken, and the checkpoint is terminated.
Module: ADBBMCL

System action

Processing stops.

User response

Rerun the job from the beginning.