Specifying a new SMP/E prefix for IRLM

The SMP/E prefix in the SMP/E jobs is the same for the new IRLM as for the old IRLM. Consequently, if you do not change the SMP/E prefix, the jobs overwrite your old IRLM.

Procedure

If you do not want the jobs to overwrite your old IRLM:

Edit the SMP/E jobs accordingly.