DAJB087W Job jobname required number objects
| Utilityname utility steps required number objects
per step
Explanation
These messages indicate that the job breakdown
process overrode user-specified values. The job name listed in the
message required the listed number of objects, which overrode the
number displayed in DAJB029I;
or the utility listed in the message required the number of objects
per step listed in the message, which overrode the number displayed
in DAJB375I.
User response
No action is
required.