Practice scenario 2: While practicing, planned outage at Site 1, recover to Site 2
This topic describes what to do if there is a planned outage on Site 1 while practicing at Site 3.
About this task
- Issue Suspend.
- Issue RecoverH2.
- Move the production I/O to Site 2.
- Issue Start H2->H1 to make the session capable of disaster recovery again once Site 1 has been brought back up.