You must link each user in
IBM® Controller to its corresponding IBMid
user.
Before you begin
Before you can add users to
Controller, they must have a valid IBMid.
For IBMid user creation, visit Create your IBM account page.
About this task
You must do these steps for each of your
Controller databases, such as production
and test.
Note: Only the IBM
Controller
administrator (ADM) can perform this task.
The IBMid, which should be linked to the
Controller user (ADM) would have been
collected by the IBM Project Office. The IBM Project Office provided it to the IBM Site Reliability
Engineer (SRE). When provisioning your
Controller on Cloud environment, SRE
would have created that link, between the provided IBMid and ADM Controller user, so that the
administrator can log in.
Procedure
- Open the IBM Controller Classic client
and log into the database.
| If you are |
Then |
| Starting from a blank database provisioned by IBM Controller on Cloud |
Continue to step 2. |
| Using an on-premise database restored to your IBM Controller on Cloud
environment |
Go to step 3. |
- On the Maintain menu, select
.
- Create the
Controller
users. For more information, see Create Users.
- Prepare to link Controller users to their respective IBMid.
- Export the list of users from IBM Controller Classic.
- Gather the IBMid of the users.
- Create an Import User template file (format .xlsx)
- The first row (header) is mandatory.
- Enter each user and other required information. Sample of an Import user template:
Note: Following are the details of the template column:
- ControllerUser - This is a mandatory field. This name of the Controller user is
added to this field.
- Active - This is a non-mandatory field. The valid values are F/T. This field indicates if
the user is active or suspended.
- Directive - This is a mandatory field. The valid values of this field are Add/Update.
This field indicates the action to be taken against the row.
- Create the link between Controller users and IBMid.
- Log on to Controller Web.
- Go to
.
- Import the file that you created in step 3.
What to do next
Ask all users to verify that they can access
Controller using IBM Controller Classic, Controller Web, or the Remote Excel,
depending on which user interface they have access to.