Run Change Table Reports for Dimension Structures

Follow the steps below to run change table reports for dimension structures.

Procedure

  1. On the Maintain menu, click Extended Dim 1-4 Structures/Change Table - Reports. The Extended Dimension 1-4 Structure Change Table Report window opens.
  2. Select the relevant change table version number you want to generate a report for.
  3. Click the Preview button to generate the report.
  4. Click Close.