You can upgrade IBM Sterling Control Center Monitor from V6.2.0, V6.2.1, V6.3.0 to V6.3.1 on Microsoft
Windows.
Before you begin
Read the Release Notes and the Detailed System
Requirements to ensure that your hardware and
software are compatible with the version to which you are
migrating.
Before you upgrade
IBM® Sterling Control Center
Monitor, backup most recent
conf folder under
CCInstallDirectory/conf-exported/Important:
- If you need to revert your instance to an
earlier release, the database administrator must
back up the databases.
About this task
To upgrade IBM Sterling Control Center
Monitor from
V6.2.0, V6.2.1, V6.3.0 to V6.3.1 on Microsoft
Windows:
Procedure
-
Close all IBM Sterling Control Center
Monitor consoles.
-
Stop the IBM Sterling Control Center
Monitor EP.
-
Take a snapshot of the IBM Sterling Control Center
Monitor database for fall back purposes.
-
Run the exportConfig.bat script to back up
your configuration data.
-
Run the installer and select the existing IBM Sterling Control Center
Monitor installation folder as the destination folder.
-
For all prompts, keep the same value that was defined in the
previous version and click
Next.
-
Run configCC.bat if you have a command line
for the upgrade.
Attention: During the Event Processor Name
installation step, you can use only alphanumeric
characters to name the EP. The EP name must be
unique in the database. Do not select Yes for
reinitialization of the database for
Production.
Important: Do not select
Yes for reinitialization of
the database for production. Reinitializing the
database will result in the loss of monitored server
activity data and impact features, including but not
limited to monitoring and reporting.
-
Start the IBM Sterling Control Center
Monitor EP.
-
Log in to IBM Sterling Control Center
Monitor Web Console from one of the supported browser by
typing http://<host address>:port or
https://<host address>:port.