Setting up disaster recovery
With IBM® Sterling Control Center Monitor 6.1 or later, you can configure a clustered environment to balance the load of monitoring servers and high availability.
About this task
There are two major cases of failover:
- Failover within a single data center (DC)
- Failover across multiple DCs