Installing and configuring IBM Sterling Control Center Monitor for high availability with the GUI installer
You can install and configure IBM® Sterling Control Center Monitor for high availability with the GUI installer. To have a high availability environment, you must plan to install multiple event processors.
Ensure that you have an existing event processor that is running by either upgrading it to
IBM Sterling Control Center
Monitor V6.3.0 or installing a new
event processor.
Important: For each new event processor, you must specify the same database
connection details, but specify different event processor names.
To install and configure IBM Sterling Control Center
Monitor for high availability with the
GUI installer:Repeat these steps for every new event processor you want to install and configure for high
availability.