Containerization Support with IBM Sterling Control Center Director
With Control Center v6.2 ifix 04 release, containerization support is available with IBM® Sterling Control Center Director also.
Before you begin
Make sure you have configured the following before you deploy IBM Sterling Control Center Director in a containerized environment:
- The entitlement (“productEntitlement”) includes CCD
webHttpsPort
is configured- Certificate (keyStore / trustStore) is configured
- “packagePath” is configured
Deployment
For more details, refer the documentation for Control Center Monitor and follow the same for
Control Center Director too: