Running reports on demand
You can run an existing report on demand.
To run a report that has been saved:
- From the Sterling Control Center Monitor menu, select to display the Report Listing window.
-
Select the report you want to run and click the Run Report button.
The report is displayed in a separate browser.
- To print and save the report output, use the print and save functions in browser.
- When you are finished viewing the report output, click the browser close button to close the report output window.