Schedule for later jobs
Configuration jobs that have been held to run later can be updated before running.
The schedule for later jobs are automatically run as per the selected schedule. But, if you wish to run it before the selected time, you must change its properties. You can select to run a job instantly or hold it to run it manually later. The properties of only Create, Update, Delete jobs can be updated. To change the properties of such jobs:
- Go to ,
- Select a job with a status of Job Held. From its overflow menu icon (
) click Properties.
- Change properties and settings of the job as needed.
- Click Submit.