Create rules to provide system instructions that IBM® Sterling Control Center
Monitor executes
automatically.
You can also use predefined rules provided with IBM Sterling Control Center
Monitor.
Tip: IBM Sterling Control Center
Monitor comes
with a standalone utility that simplifies creation of multiple actions,
rules, and other IBM Sterling Control Center
Monitor objects.
To create a single rule:
- Select from
the IBM Sterling Control Center
Monitor window.
The Rules listing is displayed.
- Click the Create button to display the Create
Rule wizard.
- Type a Name and Description for
the rule, click Enable to enable it, and click Next.
- Specify one or more parameters to further define the rule
by choosing a Key and Operator and
entering a Value. The list of operators depends
on whether the parameter is numeric (Return Code and File Size) or
alphanumeric. Click Next.
Tip: When choosing multiple Values for a single Key, separate
the Values with a pipe (|) character and use Reg Ex as the Operator.
-
Select one or more Schedules to associate with the rule by choosing from
the drop-down list.
Tip: Create a new schedule by clicking the Create button for
Rule / Metadata Schedules. You can duplicate an existing schedule and modify
the duplicate by clicking the Duplicate button. View the properties of a schedule in either
Rule / Metadata Schedules or Selected Schedules by
selecting the schedule and clicking the Properties button.
- Select an Action to perform when
the defined parameters and schedules are met. For a linked rule, this
is the first action to complete when IBM Sterling Control Center
Monitor detects
the initial condition. Click Next.
Tip: Create a new action by clicking the Create button next
to Action. You can duplicate an existing action
and modify the duplicate by clicking the Duplicate button. View an
action's properties by selecting the action and clicking the Properties
button.
- If this is a linked rule, take the following steps: Click Enabled to
enable the linkage. Specify the Parameters (conditions)
under which the linked rule is to be triggered. Specify a Resolution
Action to take if the linked rule's condition is
resolved before the timeout period elapses. Specify a Non-Resolution
Action to take if the condition remains unresolved after
the timeout period has elapsed. And specify the Timeout period
in minutes.
Attention: Process events (Process Started, Process Step Started, Process Step Ended,
and Process Ended) are all generated simultaneously by IBM Sterling Control Center
Monitor for Sterling Connect:Enterprise® for z/OS®, Sterling Connect:Enterprise for UNIX, and most native FTP
servers because only the file transfer ending event is recognized. This simultaneous generation can
impact linked rules that you create for process events of these server types.
- Click Next and then Finish to
add the rule to the Rules listing.
- Click Close to close the Create
Rule wizard.
After you create a rule, it is displayed in the Rules listing.
Enabled rules are applied in the order in which they are listed. Therefore,
rules with specific criteria should precede rules with general criteria.
Only one rule per rule set is triggered per event, so if the first
rule is too general, a match always occurs and subsequent rules are
ignored.