Adding work nodes as steps in the process
In the builder, begin to model your process by adding new or existing work nodes to the process.
About this task
In the graphical process builder, you can graphically create or update your process. When you are creating a process, the builder supplies the start node and end node for you.
You can add a work node to a process at any time. You might update a process because the way an enterprise performed a process has changed or no longer exists.
Procedure
What to do next
- You can
add work nodes by repeating this task. Restriction: Although you can reuse work nodes in different processes, you can include only one instance of a specific work node in a process.
- You can move nodes by dragging and dropping them. If you want to move a work node to a different point in a process, you must first delete any connectors to and from it, otherwise, when you drag the work node, the connectors remain attached to it. After you remove the existing connectors, you can move the work node to the new location and establish new connections at its new location.
- You can delete a work node by clicking it and pressing Delete.