Running an Object Using the Schedule

Specifying options and parameter values as part of the schedule of an object provides you with a way to change how an object is run in the future.

When an object runs based on its bibus » schedule, the first instance of an option or parameter is used where the search order is

  1. the bibus » schedule of the object

  2. the properties of the object in the content store being run

  3. user preferences for the user associated with the schedule or the current session

  4. service defaults set in the bibus » configuration » serviceDefaultOptions property (for some services)

  5. system defaults

Note: Administrators can constrain option values using the bibus » configuration » overrideOptions property. For more information, see Constraining Option Values and Setting Service Default Values

What's new

New in Version 10.1.0 — Accessibility

This topic was updated.