Default format no longer required in schedules and jobs

You are no longer required to specify a default format when you set a schedule or create a job.

If no default is selected, you can instead use the output format in one of these settings:

  • the default Report format value in your My preferences window
  • the output format that was assigned to the report when it was created
For more information, see these topics: