Upgrading IBM Automation Document Processing
If you installed a previous version of IBM Automation Document Processing, you can now move to a newer version.
About this task
When you upgrade Automation Document Processing, you must also upgrade the FileNet® Content Manager components that you use with document processing.
Plan your upgrade to accommodate all of the related components. The following diagrams highlight
the components that are always installed when you install a document_processing
pattern, along with the optional components. Your upgrade steps might be different depending on
whether you are upgrading an authoring environment or a runtime environment.

- Business Automation Navigator: navigator_configuration
- FileNet Content Manager: ecm_configuration
- Document Processing: document_processing
- Application Engine: application_engine_configuration
- Business Automation Insights: bai_configuration
- Resource Registry: resource_registry_configuration
- Business Automation Studio: bastudio_configuration

- Business Automation Navigator: navigator_configuration
- FileNet Content Manager: ecm_configuration
- Document Processing: document_processing
- Application Engine: application_engine_configuration
- Resource Registry: resource_registry_configuration
After you complete the upgrade, you must update any deployed document processing applications to the latest version and re-import them in Business Automation Navigator.
- After an upgrade from the previous version, make sure to retrain your extraction model for your existing projects, and then redeploy the projects to the runtime environment.
- To avoid any loss of project data when upgrading, you must force your latest changes to be saved to the remote Git server by sharing the project. Before you start the upgrade process, open each Document Processing project and from the Designer main page, click Share.
Procedure
What to do next
- Continue to configure the other capabilities that are in your CR file, and make sure that you complete the last step Validating the YAML in your custom resource file before you apply the CR to the operator.
- Apply the modified custom resource file as described in Applying the upgraded custom resource for the upgrade to take place.
- Go to Completing the IBM Automation Document Processing upgrade to complete the post-upgrade steps.