System requirements

The administrator must make sure that the target cluster on OpenShift Container Platform 4.6+ has the capacity for all of the capabilities that you plan to install.

Note: Db2® Universal and OpenLDAP are installed along with a set of Common Services as part of the deployment. For evaluation workloads where higher levels of activity are needed, you must install an enterprise deployment and configure a dedicated database.
A cluster where you want to install all of the capabilities needs the following configuration.
  • Master (3 nodes): 4 vCPU and 8 Gi memory on each node.
  • Worker (5 nodes): 16 vCPU and 32 Gi memory on each node.
  • Approximately 1,500 GB of storage.
The following table shows the minimum requirements for each Cloud Pak capability. Storage includes all persistent volumes (PVs) and all the databases that are needed.
Table 1. Cluster sizing information for each Cloud Pak capability
Capability / Pattern vCPU Memory Storage
Automation Content Analyzer 3 master nodes with 4 vCPUs

3 worker nodes with 8 vCPUs

16 Gi on each node 100 GB
Automation Decision Services 3 master nodes with 4 vCPUs

3 worker nodes with 4 CPUs

16 Gi on each node 20 GB
Automation Document Processing

3 master nodes with 4 vCPUs

3 worker nodes with 16 vCPUs

For 21.0.1

3 master nodes with 4 vCPUs

4 worker nodes with 8 vCPUs

3 master nodes, 16Gi on each node

3 worker nodes, 32Gi on each node

For 21.0.1

16 Gi on each node

64 GB
Business Automation Workflow and Automation Workstream Services without Business Automation Insights 3 master nodes with 4 vCPUs

3 worker nodes with 8 vCPUs

16 Gi on the master node

24 Gi on each worker node

300 GB

Business Automation Workflow and Automation Workstream Services with Business Automation Insights 3 master nodes with 4 vCPUs

3 worker nodes with 10 vCPUs

16 Gi on the master node

24 Gi on each worker node

850 GB

Business Automation Application 3 master nodes with 4 vCPUs

3 worker nodes with 4 vCPUs

8 Gi on each node 60 GB
IBM FileNet® Content Manager 3 master nodes with 4 vCPUs

3 worker nodes with 4 vCPUs

16 Gi on each node 70 GB
Operational Decision Manager 3 master nodes with 4 vCPUs

3 worker nodes with 4 vCPUs

4 Gi on each node 5 GB
Platform foundation

For more information about IBM Automation foundation (Common Services) requirements, see Hardware requirements and recommendations for common services.

3 master nodes with 4 vCPUs

3 worker nodes with 4 vCPUs

8 Gi on each node 20 GB per pod