Locking and unlocking projects
Lock a project to prevent further modifications after a financial report has been finalized or released. Unlock a project to re-enable editing.
About this task
A locked project cannot be edited, but it can still be copied and downloaded.
Procedure
- On the Projects page, locate the project.
- Click the Actions menu (⋮).
- Select Lock to lock the project, or select Unlock to remove the lock.
Results
Lock: The project is locked. A lock indicator is displayed next to the project name. All editing functions within the project workspace are disabled.
Unlock: The lock is removed and the project becomes editable and the latest data from IBM Controller is pulled.
What to do next
Note: Only users with the Unlock permission can unlock a
project. Locking a project does not affect the ability to move it into a folder using
drag-and-drop.