Adding an existing or a copied solution to a VCS (deprecated)
For a solution that existed before you integrated with a version control system (VCS),
you should establish an initial baseline version in the VCS before you make additional changes to
that solution. You should also establish an initial baseline version for a copied
solution.
Procedure
To create a baseline in the VCS for an existing or a copied solution:
- Open Case Builder.
- On the Manage Solutions page, click for the solution.
This topic only applies to BAW, and is located in the BAW repository. Last updated on 2025-03-13 12:15