Adding an exposed process value to a report (deprecated)

Draft comment:
This topic only applies to BAW, and is located in the BAW repository. Last updated on 2025-03-13 12:15
When you create an exposed process value (EPV), you can link it in a report.

Before you begin

The reporting functionality is deprecated in Business Automation Workflow V8; by default it is not enabled. To enable reporting, in Process Designer go to File > Preferences > IBM BPM > Capabilities, and enable the Backward Compatibility capabilities.

To perform this task, you must be in the IBM® Process Designer desktop editor, which is deprecated.

Procedure

  1. Click the plus sign next to the Performance category in the library, and open the report to which you want to link this EPV.
  2. Click the Overview tab.
  3. In the Exposed Process Values section, click Link EPV and select the EPV from the list.

Results

Now, users can adjust variable values directly from a report.