setTaskPropertyValues operation
Draft comment:
This topic was viewed 2 times since its publication
Sets the task property values for a particular task. This method typically applies when
updating the task properties on a task other than the current one. For the current task, you can use
step parameters to set the task properties.
This topic was viewed 2 times since its publication
| Parameter | Type | Description |
|---|---|---|
| taskId | String | The explicit ID of a task other than the current one. For the current task, use step parameters. |
| taskPropertyNames | String[] | The list of task properties to update. |
| taskPropertyValues | String[] | The list of property values. The list length must have the same length as
the taskPropertyNames parameter. Time values are expressed in the form
yyyy-MM-ddTHH:mm:ssZ. Multivalue properties are expressed in a string
representation of arrays. The parameters in the inner array should be surrounded by single quotes
('), not double quotes ("). The following example shows a possible entry in IBM®
FileNet® Process Designer for this argument:
|
This topic only applies to BAW, and is located in the BAW repository. Last updated on 2025-03-13 12:15