Synchronizing Attach events with test configurations
If you have attached the integration test client to a test
configuration module and you later add another module to the test
configuration, you will need to synchronize the Attach event with
the test configuration to enable the integration test client to attach
to the added test configuration module.
About this task
Procedure
- In the integration test client, click the Events tab to open the Events page.
- In the Events area, right-click the Attach event and select Synchronize Configuration. The Attach event and the test configuration are synchronized.
This topic only applies to BAW, and is located in the BAW repository. Last updated on 2025-03-13 12:15